Phase 1 Lighting Monitoring

The monitoring data on this page reflects performance standard monitoring collected during Phase 1 dredging. Phase 1 dredging occurred from May 15, 2009 to October 26, 2009 and the data was collected from May 2009 to December 2009. EPA issued performance standards for Phase 2 dredging based on the knowledge gained during Phase 1 and input from the peer review panel. To return to viewing Phase 2 performance standard monitoring Click Here.
Legend

Typical Operations: Lighting levels comply with the standard

Control Level: Lighting level is above existing standard, although exceedance can be easily and immediately mitigated OR a project-related complaint is received from the public

Exceedance Level: Recorded exceedance of the lighting standard is not easily and immediately mitigated OR frequent, recurrent complaints related to project activities

Phase 1 Calendar (Please click on data for more information)


Phase 1 dredging occurred between May 15 - Oct 26, 2009.

Return to Phase 2 Monitoring
«    April 2011
SundayMondayTuesdayWednesdayThursdayFridaySaturday
1
Processing Facility: See Note
River Operations: See Note
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Goal of the Phase 1 Standard

The performance standard for lighting requires the monitoring of light levels on a regular basis. The standard varies with the type of area – rural and suburban, urban or commercial/industrial.

The performance standard for lighting sets the following limits:

lighting table

Note: a 60-watt light bulb at 25 feet produces 0.1 footcandle

How Does the Phase 1 Standard Work?

  • Regular monitoring
  • Receive, investigate and respond to complaints
  • Take action to minimize lighting
  • Reporting and notification by the cleanup team to EPA

How We Monitor

Lighting at the dewatering facilities and during dredging operations is directed toward work areas and away from neighboring properties.

 